Numerical Simulation of Construction Process of Large Building Project Based on Discrete Element Method
DOI: 10.23977/engsm.2019.11001 | Downloads: 18 | Views: 4375
Author(s)
Wang Peng 1
Affiliation(s)
1 School of Economics and Management, Dalian University, No.10, Xuefu Avenue, Economic & Technical Development Zone, Dalian, Liaoning, The People's Republic of China (PRC)
Corresponding Author
Wang PengABSTRACT
Assembling integrated concrete cutting construction technology is a kind of construction engineering means commonly used in large stadiums at present. The advantage of this method lies in that it is connected by reinforcing bars, connecting pieces or applying prestress and pouring concrete members on site, which significantly enhances the mechanical resistance of construction engineering. And milling and planing machine as a large stadium assembly integrated concrete cutting construction indispensable important engineering machinery, its demand continues to grow, domestic independent research and development of high-performance milling and planing machine is urgent. Based on three-dimensional discrete element method model conforms to the macroscopic mechanical properties of the road, establish milling planer operation simulation model of quantitative stadium assembled monolithic concrete construction process of milling planer cutting resistance, using uniaxial compression and splitting tensile test to determine the compressive modulus of asphalt concrete pavement and tensile modulus, obtain the macro level check micro contact connection parameters. Discrete element specimens with coarse aggregate of irregular shape are generated by using the algorithm of 3d discrete element software PFC3D. Through the establishment of kinematics model, the critical condition expression of vibration planer is deduced, and the improvement of the working process force by adding different vibration modes is studied, so as to calculate the optimal combination value of vibration planer amplitude and vibration frequency, and obtain the better vibration mode of milling planer.
KEYWORDS
Large stadiums, Assemble integrated concrete, Cutting construction, The numerical simulationCITE THIS PAPER
Peng Wang, Numerical Simulation of Construction Process of Large Building Project Based on Discrete Element Method, Engineering and Solid Mechanics (2019) Vol. 1: 1-5. DOI: http://dx.doi.org/10.23977/engsm.2019.11001.
REFERENCES
[1] Rajan Varadarajan. (2018) Concrete pump displacement measurement method based on pumping pressure, ACS Applied Materials & Interfaces, 42, 108-122.
[2] Andrea Schenker‐Wicki. (2017) Flexible multi-body dynamics modeling and simulation of concrete pump truck boom, ACTA MECHANICA SINICA, 1, 105-138.
[3] Robert J. Allio. (2019) Robustness to uncertain optimization using scalarization techniques and relations to multiobjective optimization. Applicable Analysis, 1, 119-136.
Downloads: | 18 |
---|---|
Visits: | 4375 |
Sponsors, Associates, and Links
-
Cybernetics and Mechatronics
-
Journal of Engineering Mechanics and Machinery
-
Digital Manufacturing and Process Management
-
Ultra-Precision Machining Process
-
Journal of Robotics and Biomimetics
-
Prognostics, Diagnostics and Health Management
-
Micro-Electro-Mechanical Systems
-
Journal of Precision Instrument and Machinery
-
Fracture and Damage Mechanics
-
Frontiers in Tribology
-
Fluid and Power Machinery
-
Chemical Process Equipment
-
Journal of Assembly and Manufacturing
-
Mechanical Vibration and Noise