Education, Science, Technology, Innovation and Life
Open Access
Sign In

Risk Assessment of Malaysia East Coast Rail Link Project

Download as PDF

DOI: 10.23977/jsoce.2022.040102 | Downloads: 76 | Views: 1127

Author(s)

Hanwen Ye 1

Affiliation(s)

1 Yunnan University of Finance and Economics, Kunming, Yunnan, China

Corresponding Author

Hanwen Ye

ABSTRACT

The east coast rail link project (ECRL) is the largest economic and trade cooperation project between China and Malaysia up to now. This paper makes a risk assessment of ECRL project from the perspective of Chinese enterprises and proposes possible solutions.

KEYWORDS

Ecrl, Political risk, Social risk, Economical risk, Analysis, Solutions

CITE THIS PAPER

Hanwen Ye, Risk Assessment of Malaysia East Coast Rail Link Project. Journal of Sociology and Ethnology (2022) Vol. 4: 7-10. DOI: http://dx.doi.org/10.23977/jsoce.2022.040102.

REFERENCES

[1] Craig A. Lockard, Zakaria Bin Ahmad, Ooi Jin Bee, Thomas R. Leinbach. (2020). Malaysia, Encyclopedia Britannica ,[online] Available: https://www.britannica.com/place/Malaysia/Economy 
[2] East Coast Rail Link (ECRL) Project, Malaysia. (n.d.), [online] Available: https://www.railway-technology.com/projects/east-coast-raillink-ecrl-project/ 

All published work is licensed under a Creative Commons Attribution 4.0 International License.

Copyright © 2016 - 2031 Clausius Scientific Press Inc. All Rights Reserved.