Education, Science, Technology, Innovation and Life
Open Access
Sign In

Analysis of Bim-Based Project Cost Management Maturity Model under the Vat Reform

Download as PDF

DOI: 10.23977/ieim.2021.040110 | Downloads: 7 | Views: 925

Author(s)

Anqi Li 1

Affiliation(s)

1 North China Institute of Science and Technology, Langfang, Hebei 065201, China

Corresponding Author

Anqi Li

ABSTRACT

Under the reform of the camp, BIM technology plays an essential role in the actual work. BIM technology can integrate a large amount of information in engineering construction on the basis of three-dimensional technology. At the same time, China's tax authorities vigorously promote the implementation of the pilot reform of the camp. Under such a background, China's construction industry is required not only to pay attention to economic development. The energy problem should also be placed at the key position in the process of enterprise development, which requires relevant units to constantly improve the level of project cost management. Under the implementation of the reform of the tax system of the business reform, the requirements of the project cost on marketization and informatization are more strict. Under the implementation of the reform of the tax system of the business reform, the requirements of the project cost on marketization and informatization are more strict. BIM Technology is fast, accurate in cost calculation and real-time control of the construction dynamic, multi angle problem and efficient cost control problem. BIM is no longer limited to plane, and the data drawn is not limited to points, lines and faces, but involves the building components with accurate parameters such as walls, doors, windows, etc. BIM Technology has the advantages of fast calculation, accuracy and stability, and can control the construction process of the project in real time. This paper mainly discusses and analyzes the project cost management based on BIM Technology under the operation reform and increase, and seeks the key points of project cost management in this process, and provides a theoretical support for the construction of various projects in China.

KEYWORDS

Business reform, Bim technology, Project cost

CITE THIS PAPER

Anqi Li. Analysis of Bim-Based Project Cost Management Maturity Model under the Vat Reform. Industrial Engineering and Innovation Management (2021) 4: 69-74. DOI: http://dx.doi.org/10.23977/ieim.2021.040110.

REFERENCES

[1] Shen Hongjun, Chen Weigang. Research on project cost management based on BIM technology under the transition from business tax to business tax. Chinese and Foreign Construction, vol. 000, no. 002, pp. 172-174, 2019.
[2] Liang Jianping. Research on engineering cost management based on BIM technology under the VAT reform. Building materials and decoration, vol. 593, no. 32, pp. 163-164, 2019.
[3] Wu Xiufang. On the fine management of construction enterprises. Journal of Hebei Institute of Civil Engineering and Architecture, vol. 034, no. 003, pp. 116-118, 2016.
[4] Ji Jianmin. Tax planning strategies of construction companies under the background of the VAT reform. China Industrial Economics, vol. 255, no. 23, pp. 30-31, 2020.
[5] Liu Yubei. Application of BIM in the life cycle management of expressway electromechanical engineering. Engineering technology development, vol. 2, no. 1, pp. 39-40, 2021.
[6] Hu Bin. Practical discussion on engineering cost management based on BIM technology. Building materials and decoration, vol. 565, no. 04, pp. 140-141, 2019.
[7] Sun Jinglu. Leveraging PPP to boost the transformation and upgrading of cost consulting enterprises. China Construction Information Technology, vol. 000, no. 018, pp. 16-19, 2017.
[8] Wang Weiping. Elementary discussion on the influence factors of construction project cost under the new form and the countermeasures to reduce the project cost. Big Science and Technology, vol. 000, no. 013, pp. 247-248, 2016.
[9] Zheng Xiaocang. Analysis of new features and measures of project settlement under the background of the VAT reform policy. Building materials and decoration, vol. 573, no. 12, pp. 225-226, 2019.
[10] Wang Ying. Analysis of the pricing countermeasures for the bidding of construction general contracting projects under the VAT reform. Chemical Management, vol. 530,no. 23, pp. 160-161, 2019.

Downloads: 11416
Visits: 272602

All published work is licensed under a Creative Commons Attribution 4.0 International License.

Copyright © 2016 - 2031 Clausius Scientific Press Inc. All Rights Reserved.