Education, Science, Technology, Innovation and Life
Open Access
Sign In

Creep Control and Construction Technology for Laying Ballastless Tracks on a 420m Ultra Long Span High-speed Railway Cable-stayed Bridge

Download as PDF

DOI: 10.23977/jceup.2023.051208 | Downloads: 19 | Views: 266

Author(s)

Jun Gao 1,2, Juntao Kang 1, Dongsheng Xu 1,3, Huiling Xue 1

Affiliation(s)

1 School of Civil Engineering and Architecture, Wuhan University of Technology, Wuhan, 430070, China
2 National Railway Group Wu Guang High Railway Company, Wuhan, Hubei, 430212, China
3 Sanya Science and Education Innovation Park of Wuhan University of Technology, Sanya, 572024, China

Corresponding Author

Jun Gao

ABSTRACT

Ballastless track plays a crucial role in railway transportation. Traditional construction techniques are difficult to effectively ensure the stability and safety of ballastless track structures, and cannot achieve effective creep control. In order to improve the effect of creep control and enhance the quality of ballastless track laying in cable-stayed bridges, this paper took the ballastless track laying project of a 420m ultra long span high-speed railway cable-stayed bridge as the object, and conducted in-depth research on its creep control and construction technology. This article first analyzed the factors affecting the creep of ballastless tracks, and then, based on this, ensured the stability and creep control of the cable-stayed bridge structure through tension calculation and cable force adjustment. Finally, based on the calculation results, construction optimization was carried out. This article conducted experimental analysis from two levels: structural safety assessment and creep measurement, to confirm its efficacy. The findings demonstrated that over the observation period, the three randomly chosen control locations' average cumulative changes in the horizontal plane coordinates did not surpass 1 millimeter. The article's conclusion suggested that the creep control and construction technology could raise the caliber and standard of rail transportation while also assisting in enhancing the stability and safety of the ballastless track of the 420-meter ultra long span high-speed railway cable-stayed bridge.

KEYWORDS

Cable-stayed Bridge, Ballastless Track, Creep Control and Construction, High-speed Railway, Rail Transit

CITE THIS PAPER

Jun Gao, Juntao Kang, Dongsheng Xu, Huiling Xue, Creep Control and Construction Technology for Laying Ballastless Tracks on a 420m Ultra Long Span High-speed Railway Cable-stayed Bridge. Journal of Civil Engineering and Urban Planning (2023) Vol. 5: 53-59. DOI: http://dx.doi.org/10.23977/jceup.2023.051208.

REFERENCES

[1] Xingwang Sheng, Weiqi Zheng, Zhihui Zhu, Aiguo Yan, Yongping Qin. "Ganjiang Bridge: A high-speed railway long-span cable-stayed bridge laying ballastless tracks." Structural Engineering International 31.1 (2021): 40-44.
[2] Zhaoling Han, Shengyang Zhu, Wanming Zhai, and Bin Zhu. "Static and dynamic effects of train-track-bridge system subject to environment-induced deformation of long-span railway bridge." Proceedings of the Institution of Mechanical Engineers, Part F: Journal of Rail and Rapid Transit 237.1 (2023): 93-103.
[3] Hongye Gou, Liu Chang, Xie Rui, Bao Yi, Lixiang Zhao, Qianhui Pu. "Running safety of high-speed train on deformed railway bridges with interlayer connection failure." Steel and Composite Structures 39.3 (2021): 261-274.
[4] Wanming Zhai, Zhaoling Han, Zhaowei Chen, Liang Ling & Shengyang Zhu. "Train–track–bridge dynamic interaction: a state-of-the-art review." Vehicle System Dynamics 57.7 (2019): 984-1027.
[5] Ding Yu, Xina Tao, Pengsong Wang, Hailong Huo, Peng Chen. "Performance analysis of slab track structures on long-span high-speed railway bridge." International Journal of COMADEM 22.3 (2019): 39-44.
[6] Xiaochun Liu, Zhiwu Yu, Ping Xiang, and Cheng Jin. "Composite action of the track slab and the self-compacting concrete filling layer subjected to train-induced fatigue load: An experimental investigation." Proceedings of the Institution of Mechanical Engineers, Part F: Journal of Rail and Rapid Transit 233.5 (2019): 580-592.
[7] Javanmardi Ahad, Khaled Ghaedi, Fuyun Huang, Muhammad Usman Hanif & Alireza Tabrizikahou. "Application of structural control systems for the cables of cable-stayed bridges: state-of-the-art and state-of-the-practice." Archives of Computational Methods in Engineering 29.3 (2022): 1611-1641.
[8] De Zhang, Junhua Xiao, and Xiao Zhang. "Effects of pier deformation on train operations within high-speed railway ballastless track–bridge systems." Transportation Research Record 2672.10 (2018): 96-105.
[9] Lingkun Chen, Asli Kurtulus, Yufeng Dong, Ertugrul Taciroglu &Lizhong Jiang. "Velocity pulse effects of near-fault earthquakes on a high-speed railway vehicle-ballastless track-benchmark bridge system." Vehicle System Dynamics 60.9 (2022): 2963-2987.
[10] Lili Liu, Lizhong Jiang, Wangbao Zhou, Yu Jian, Peng Kang, Yongjian Zuo. "Study on the restoring force model for the high-speed railway CRTS III Slab Ballastless Track." Archives of Civil and Mechanical Engineering 22.3 (2022):1-14.

All published work is licensed under a Creative Commons Attribution 4.0 International License.

Copyright © 2016 - 2031 Clausius Scientific Press Inc. All Rights Reserved.